A risk assessment template for trades jobs, not office paperwork
List what could hurt someone on the job, rate it, control it and get the crew to sign. Fillable PDF, print PDF or Word, ready for your logo. No sign-up.
- Fillable PDF, print PDF and Word
- 5 x 5 risk key and the hierarchy of controls
- 12-row hazard table, review log and sign-off



Take the version that suits how you work
The same four-page risk assessment in three files. Type over it, add your logo and ABN, or print it for the site. No sign-up.


What a risk assessment needs, and where it sits
The parts the template asks you to fill in for every job, and where each one sits on the page.
- Job and site details
Customer, site address, site contact, the job being assessed, who assessed it and which workers you talked to.
- How it works
The four steps WorkSafe WA and Safe Work Australia both set out: identify hazards, assess risks, control risks, review controls.
- Risk key
An example 5 x 5 likelihood x consequence matrix that gives Low, Medium, High or Extreme. If your business already has its own matrix, use that instead.
- Hierarchy of controls
Eliminate, substitute, isolate, engineering, administrative, PPE. Start at the top.
- Hazard table, 12 rows
Hazard, who could be hurt, likelihood, consequence, risk rating, controls, residual risk, who's responsible and the date it's done by.
- Review log
When you checked it again and what changed.
- Sign-off and workers briefed
Assessed by, checked by the supervisor or business owner, and the names and signatures of the people it was explained to.
A paper risk assessment works until it's sitting in the ute
EasyDone Work's workflows and checklists let you set out the steps that matter to your business, including who's responsible and what needs checking, so your team can follow the process without keeping it all in their heads.
Doing high risk construction work? The SWMS maker builds safe work method statements laid out the way WorkSafe WA's form asks, and with the morning SWMS sign-on each booked person reads, ticks and finger-signs the project's master SWMS on their phone before their first job there each day.

Risk assessment template questions
Do I have to write a risk assessment down?
WorkSafe WA and Safe Work Australia both describe managing risk in four steps: identify, assess, control and review. Both say the assessment step may not be needed when the hazards, risks and controls are already well known, and neither tells you to use a particular form. Writing it down gives you something to brief the crew with and something to check later. This is a general template, so check your obligations with your WHS regulator.
What is the hierarchy of controls?
It ranks ways of controlling a risk from most effective to least effective: eliminate the hazard; then substitute, isolate or engineer it out; then administrative controls; then PPE. Safe Work Australia says administrative controls and PPE are the least effective because they do not control the hazard at the source and rely on human behaviour and supervision.
How do I rate likelihood and consequence?
Score how likely harm is from 1 (rare) to 5 (almost certain), and how bad it could be from 1 (insignificant) to 5 (catastrophic). Multiply the two. The risk key on page 1 turns that number into Low, Medium, High or Extreme. The matrix is an example, so use your own if your business already has one.
Is a risk assessment the same as a SWMS?
No. A SWMS is for high risk construction work, such as work where someone could fall more than 2 metres or work on or near energised electrical installations, and it must be prepared before that work starts. See our free WA SWMS template.
Can I change the template?
Yes. The Word version is fully editable, so you can add your logo, change the columns or swap in your own risk matrix. You can type into the fillable PDF in a PDF reader, or print the print version and fill it in by hand.
Run your jobs and your safety checks in one place
$130 a month covers 1-2 users, then $65 for each extra user, inc GST. Try it free for 7 days. Card up front, cancel anytime.